More
    HomeTopicsEnergyRețele Electrice Banat invests almost 70 million RON in energy infrastructure in...

    Rețele Electrice Banat invests almost 70 million RON in energy infrastructure in Caras Severin

    Published on

    Rețele Electrice Banat has launched a procurement procedure for the modernization of medium and low voltage networks in Caras-Severin County. The total value of the tender is almost 70 million RON, while the value of the project is 74 million RON, of which 57.7 million RON will be provided by the Modernization Fund, a special fund aimed at improving the energy infrastructure and supporting the transition to a more efficient and sustainable distribution system.

    “Investments in modernizing electricity grids are essential to give consumers the confidence that their electricity supply will be uninterrupted, regardless of extreme weather conditions. For us, the distribution operators, this means complex technical solutions – from moving infrastructure underground to fully digitizing the network so that faults are automatically detected and resolved. These upgrades not only increase the resilience of the grid, but also contribute to a more sustainable integration with the environment and the local community” stated Mihai Vangu, Director Rețele Electrice Banat.

    The works will be carried out in Berzovia, Bocșa, Duleu, Remetea-Poganici and Valea Mare, with the support of local authorities and with a positive impact on consumers in these areas.

    In Berzovia, the project will upgrade 59.6 km of 20 kV overhead lines and 6.2 km of low voltage overhead lines, a significant part of which will be undergrounded for greater safety and reliability. In addition, 21 transformer substations will be modernized, thus facilitating the implementation of a modern remote control and automation system for the network.

    In the villages of Duleu, Remetea-Poganici, Valea Mare and Bocșa, the modernization works will also include the low-voltage network, improving the quality of electricity supply for 4,700 customers. These interventions will ensure more reliable distribution, reduce network losses and contribute to lowering the local carbon footprint.

    The deadline to submit bids is October 22, 2024, with a contract duration of 42 months.

    Latest articles

    Deutsche Bank’s Technology Centre in Romania doubles its workforce over the past five years, aims to hire 200 specialists in 2026

    DB Global Technology, Deutsche Bank’s technology centre in Romania, has doubled in size over...

    IULIUS to invest 9 million euros in refurbishing the Iulius Mall Iasi shopping center

    Companies IULIUS and Atterbury Europe are allocating 9 million Euro to revamp Iulius Mall...

    Patria Bank strengthens partnership with Alive Capital by financing renewable energy infrastructure

    Patria Bank announces the signing of a renewable energy supply agreement with Alive Capital,...

    Cristian Pîrvulescu, ENEVO: “Energy transition enters new phase focused on grids, digitalization and cybersecurity”

    The energy transition has moved beyond simply installing renewable generation capacity and is entering...

    More like this

    Deutsche Bank’s Technology Centre in Romania doubles its workforce over the past five years, aims to hire 200 specialists in 2026

    DB Global Technology, Deutsche Bank’s technology centre in Romania, has doubled in size over...

    IULIUS to invest 9 million euros in refurbishing the Iulius Mall Iasi shopping center

    Companies IULIUS and Atterbury Europe are allocating 9 million Euro to revamp Iulius Mall...

    Patria Bank strengthens partnership with Alive Capital by financing renewable energy infrastructure

    Patria Bank announces the signing of a renewable energy supply agreement with Alive Capital,...